Laid off from Ametek.

Ametek has grown by buying other manufacturers, and its closing notices since 2025 have come from businesses it bought. It has also cut company-wide, in workforce reductions booked in 2015, 2016 and 2020 as the economy weakened.

What we know about Ametek severance and layoffs

  • About 10% of Ametek's employees cut in 2020, its chief executive said
  • $35.5 million in severance costs for Ametek's 2020 workforce reduction
  • 167 jobs on Bison Gear's 2025 closing notice for its St. Charles, Illinois plant
  • 96 Gatan workers on a 2025 temporary-closure notice in Pleasanton, California
  • 40 jobs in IntelliPower's 2026 permanent-closure notice in Orange, California
  • $25.3 million in 2025 FARO integration costs, employee severance among them

The most recent Ametek layoff we've found

The newest Ametek notice in our tracker, received by Illinois on September 1, 2026, covers 63 permanent layoffs at 250 Madsen Dr. in Bloomingdale, and the state's September 2026 WARN report gives the company's business as surgical and medical instrument manufacturing. The tracker files it under Ametek and LaVezzi Precision, a company on Ametek's 2025 subsidiary list.

What Ametek layoffs have meant for employees

If the name on your paycheck is Gatan, IntelliPower or another business Ametek owns, a layoff notice for your site could be filed under that name and not Ametek's. Gatan's Pleasanton notices, IntelliPower's 2026 notice and FMH Aerospace's 2020 notice in Irvine went in under those names, and Ametek's 2025 subsidiary list includes all three companies. The St. Charles notice carried both names, Ametek Bison Gear & Engineering, and our tracker lists the Bloomingdale notice under Ametek and LaVezzi Precision, another company on that list. Counting those units' own filings, 13 Ametek notices are in the tracker. To check whether your site has had one, a search under the unit's name as well as Ametek's may find it.

At St. Charles, where Bison designed and made custom motion control products, the closing announcement came about two years after Ametek bought Bison Gear, the Kane County Chronicle reported. By then Ametek had combined Bison with its own Dynamic Fluid Solutions business into one unit based in Kent, Ohio, which Power Transmission Engineering said in August 2023 made its products in Whitsett, North Carolina, Reynosa, Mexico and Shanghai as well as St. Charles. IntelliPower's permanent-closure notice for Orange, listed in California's WARN report, came more than six years after the January 2020 purchase recorded in Ametek's 10-K for 2020. Neither the Chronicle's story nor the state's report says where the work went.

Gatan's notices have been temporary ones. All four since Ametek bought the company in October 2019 are listed that way in California's reports, a closure in March 2020, layoffs that July and October, and another closure in July 2025 at its Pleasanton address. St. Charles and Orange went the other way, with permanent closings on their notices. If you're at Gatan and another notice comes, California's report gives the type it records, temporary or permanent, in the same row as the effective date.

Ametek's 2015 and 2016 cuts each started as a charge booked in one quarter and then played out over a year or more. Ametek's 2016 restructuring note says the actions behind the first-quarter 2015 charge were all completed in the second half of 2016, and that the late-2016 round would be broadly implemented across its businesses through the end of 2017, with most actions expected to be completed in 2018. The note gave the same reasons each time, a weak global economy and a strong U.S. dollar. If you were let go by an Ametek business in 2017, your job may have been part of a charge recorded in late 2016. The 2016 and 2020 charges also carried asset write-downs, $6.2 million and $8.4 million, which the filings list apart from the severance costs. In 2020, by chief executive David Zapico's account, the reduction in force covered direct, indirect and selling, general and administrative jobs, and Ametek paired it with temporary measures, among them furloughs, temporary facility shutdowns, short work weeks and pay cuts. He said the first-quarter charge was expected to yield about $85 million in annualized structural savings, according to the May 2020 call transcript.

At Bloomingdale, the first layoff date in Illinois's September 2026 WARN report, in December, applies to the first group only, and the rest run to the end of March 2027. If your job ends at an Illinois site such as Bloomingdale, Illinois's unemployment rules are set out at Illinois unemployment benefits, and California's, for the Pleasanton and Orange sites, are at California unemployment benefits.

A sourced history of Ametek layoffs

  • September 2026, Bloomingdale layoffs scheduled into 2027

    Ametek scheduled 63 permanent layoffs at its Bloomingdale site in monthly groups from December 4, 2026 or within 14 days after to March 31, 2027, Illinois's September 2026 WARN report shows, listing the employer as a surgical and medical instrument manufacturer with union and bumping rights marked yes.

  • June 2026, IntelliPower's closing notice in Orange, California

    IntelliPower, one of the subsidiaries in Ametek's 2025 10-K exhibit, filed a June 1 notice of a permanent closure for 40 workers at 1746 N. Saint Thomas Circle in Orange, effective July 31, California's WARN report shows.

  • July 2025, Gatan's temporary closure notice in Pleasanton

    Gatan, which Ametek agreed in a September 2019 announcement to buy from Roper Technologies, filed a July 15 notice of a temporary closure for 96 workers at its Pleasanton site, effective September 15, California's WARN report shows.

  • 2025, FARO integration costs including severance

    Ametek booked $25.3 million of 2025 integration costs for its FARO acquisition in cost of sales, primarily employee severance, change-in-control costs and fair-value inventory adjustments, per the 2025 Form 10-K.

  • May 2025, Bison Gear's St. Charles plant closing announced

    Ametek announced May 19 that it would close Bison Gear's St. Charles plant, two years after buying the company, and the state's WARN report showed 167 permanent layoffs beginning July 21, the Kane County Chronicle reported.

  • First quarter 2020, pandemic workforce reduction

    Ametek booked $43.9 million in 2020 realignment costs, $35.5 million of it severance, per its 10-K for 2020, and chief executive David Zapico put the reduction in force at about 10% of employees on May 5, the call transcript shows.

  • 2015 and 2016, workforce restructuring charges

    Ametek booked restructuring charges of $15.9 million in 2015's first quarter and $20.7 million in its fourth, each primarily for a reduction in workforce, and $25.6 million in late 2016, $19.3 million of it severance, its 2016 Form 10-K note shows.

What to do if you're laid off from Ametek

Ametek layoff and severance questions

What severance has Ametek given laid-off employees?

Ametek's filings give severance as company-wide totals, $19.3 million for its late-2016 workforce reduction per a 2016 Form 10-K note and $35.5 million for the 2020 reduction per its 2020 Form 10-K. Integration costs it booked in 2025 for the FARO acquisition primarily included employee severance, its 2025 annual filing shows. None of the three filings sets a formula for one person's severance, the weeks of pay or who qualified.

How many Ametek layoff notices are in the WARN tracker?

Thirteen notices by Ametek and companies it owns now sit in our WARN tracker, four of them filed since January 2025 and covering 366 jobs in Illinois and California. The older nine run from a 1999 closing in Skokie, Illinois to 2020, when Gatan filed three temporary notices for 105 Pleasanton workers each and Plastics News reported Ametek closing an Ohio compounding plant, cutting 78 jobs. Gatan, IntelliPower and FMH Aerospace filed in their own names, and each is on Ametek's 2025 subsidiary list.

Did Ametek furlough workers in 2020?

Yes. On the May 5, 2020 earnings call, chief executive David Zapico said many Ametek businesses were putting in furloughs or temporary facility shutdowns in the second quarter, generally one to three weeks long depending on the location, and that temporary pay cuts generally ran 15% to 20% for salaried employees, officers included, the call transcript records.

Has Ametek filed layoff notices in 2026?

Two 2026 notices from Ametek businesses are in our tracker, covering 103 jobs, and the newer one runs into 2027, with Illinois's September 2026 WARN report listing Bloomingdale groups of 17 in December, 20 in January, 9 in February and 17 in March. The other, from IntelliPower in Orange, California, was for a permanent closure dated to take effect July 31, according to California's WARN report.