Laid off from Forvia.
Forvia is the group behind Faurecia and Hella, and its Michigan plant closings of 2016 and 2023 came as the plants' work on a single Chrysler or Jeep vehicle was ending. In Ohio it phased the closings of its Troy and Franklin plants over several months.
What we know about Forvia severance and layoffs
- 180 jobs on the November 2026 notice closing Faurecia Clean Mobility's Franklin, Ohio plant
- 511 UAW-represented jobs in the 2023 Highland Park, Michigan seat plant closing
- 60 Troy, Ohio exhaust jobs in Faurecia's September 2024 plant closing notice
- 348 Michigan jobs in Faurecia's 2016 Chrysler 200 plant closings and layoffs
- 10,000 European jobs at most under Forvia's EU-FORWARD plan for 2024 to 2028
- 7 Faurecia notices in our WARN tracker, 2009 to 2026, across four states
The most recent Forvia layoff we've found
Faurecia Clean Mobility told Ohio in a November 6, 2026 letter that it's permanently closing its Franklin plant, with the first layoffs anticipated on or around January 8, 2027.
What Forvia layoffs have meant for employees
At Cottondale, Alabama, an earlier round of cuts wasn't the end of it. Faurecia's seating plant there, a Mercedes-Benz supplier, went through layoffs in 2015 and April 2019 and then closed in 2019, according to Catfish 100.1, and the April 2019 notice, for 118 jobs, is in our WARN tracker. The next year, Alabama posted a notice closing Faurecia's other Tuscaloosa County plant, the interior systems plant in the Airport Industrial Park. If your plant has already been through a round of layoffs, you could watch for a second Faurecia notice for your state.
Faurecia's Fraser and Sterling Heights interiors plants built instrument panels, interior components and seats for the Chrysler 200, and as Fiat Chrysler moved to end the sedan in 2016, Faurecia's North American communications director told The Source, in a story Just Auto relayed, "We're not losing business; the vehicle is going away." The two plants that weren't closing still had contracts for General Motors and Ford, he said. In 2023, Forvia described its Michigan just-in-time seating business for Jeep's Grand Wagoneer as loss-making and settled claims with Stellantis to get out of it, keeping the seat frames but relocating them to Monterrey, Mexico, by its July 2023 results. Those steps, it said, would let the program break even by the end of the third quarter of 2023. If your plant builds for one model, you could follow news about that model's production.
Every job at Franklin falls into one of five phases on the list attached to Faurecia Clean Mobility's letter to Ohio, with general operators, a train driver and an SM operator in the first and maintenance workers, supervisors and the maintenance manager in the last, and the letter says employees will get more specific word on their last day later. That puts the people who keep the plant running among the last to go. Troy's notice kept its final phase for the workers finishing out the project, and at Troy a company spokesperson told WYSO that Faurecia had reached out to local agencies to help workers look for other jobs. Most of the positions Troy was eliminating were production control technicians and mill operators, the station reported. If you're at Franklin, the date for the phase beside your job title is the letter's anticipated last day for that job, with up to two weeks' leeway, until the more specific information it promises arrives.
The Faurecia plant closings on record since 2016 are in Ohio, Michigan and Alabama, and our unemployment pages for Ohio, Michigan and Alabama cover filing a claim in each. The two Ohio notices came from Faurecia Exhaust Systems at Troy and Faurecia Clean Mobility at Franklin, so a search for either plant's notice under Forvia's name alone can miss it. Faurecia's cuts go back further, to a Kentucky seating plant in 2009 and layoffs at Spartanburg, South Carolina, in 2014.
Forvia's large cut figures come from Europe. In 2024 it announced close to 2,900 EU-FORWARD job reductions, case by case through the year and carried out locally "in the most socially responsible way," and by the end of 2025 the count stood at 6,400, according to its 2024 results and 2025 results. In late September 2024 it moved to speed the plan up, aiming to announce more than 90% of its five-year reductions by the end of 2027. A US worker reading those totals is reading about Forvia's European manufacturing and research operations. Separately, the 2025 results list a hiring freeze among the group's cost controls that year.
A sourced history of Forvia layoffs
November 2026, Franklin, Ohio Clean Mobility plant closing
All of the plant's employees are to be laid off in five phases, the last anticipated April 30, 2027 or within two weeks after, Faurecia Clean Mobility's notice to Ohio says, adding that they aren't represented and have no bumping rights.
September 2024, Troy, Ohio exhaust plant closing
Faurecia Exhaust Systems told Ohio it was permanently closing its Troy plant, with layoffs planned in five phases from November 4, 2024 to April 1, 2025, in its September 4 notice. The 60 employees had no union, and a spokesperson told WYSO the company wanted a more efficient manufacturing footprint.
February 2024, EU-FORWARD job cuts across Europe
Forvia launched EU-FORWARD, a five-year plan to rework its European manufacturing and research operations that its 2024 results said should affect up to 10,000 jobs. It had announced 6,400 of those reductions by the end of 2025, ahead of schedule, its 2025 results said.
July 2023, Highland Park, Michigan seat plant closing
Forvia's just-in-time seat work for the Jeep Grand Wagoneer in Michigan was to end as from September 30, 2023, its July 2023 results said, and the Highland Park plant's closing cost 511 UAW-represented jobs, Cluster Industrial reported.
December 2022, Highland Park facility closing notice
A Faurecia facility closing at Highland Park covered 268 layoffs in a notice Michigan received December 1, 2022, the state's WARN archive shows.
January 2020, Tuscaloosa, Alabama interiors plant closing
Faurecia's interior systems plant in Tuscaloosa's Airport Industrial Park would close, with 166 employees losing their jobs and cuts running from March 20 into June 2020, Catfish 100.1 reported from the state's notice.
October 2016, Chrysler 200 plant closings in Michigan
With Fiat Chrysler ending Chrysler 200 production that December, Faurecia was closing interiors plants in Fraser and Sterling Heights and cutting jobs at two others, 348 in all, Just Auto reported.
What to do if you're laid off from Forvia
- File for unemployment in the state where you worked. Benefits run from your filing date, and severance usually doesn't block you. Forvia's biggest hubs: Ohio, Michigan, Alabama. Somewhere else? Every state is here.
- Apply for financial and hardship assistance. Unemployment supplements income, but food benefits, health coverage and utility help are often available as well. Here's some of what Forvia's hub states run: Ohio, Michigan, Alabama, and every other state is here.
- Mind the health insurance window. Losing coverage opens a 60-day special enrollment period, and an ACA plan usually beats unsubsidized COBRA. Compare your options before the employer coverage lapses, and read how the COBRA clocks run if you are weighing it seriously.
- Get your real runway number. Severance plus savings divided by reality. The calculator takes five minutes.
- Know which clocks are already running. Severance review windows, COBRA election, visa grace periods, and 401(k) rollovers all run on federal deadlines that started at termination. All five deadlines are here.
Forvia layoff and severance questions
What severance has Forvia given laid-off employees?
Neither of Faurecia's Ohio closing letters, the Troy notice of 2024 or the Franklin notice of 2026, lists severance terms, and both say employees will receive benefit information later. If your job is at Franklin, the Ohio unemployment page we keep covers filing a claim in that state.
Does Forvia's 10,000-job cut plan include US plants?
EU-FORWARD covers Forvia's European plants and research operations, by its 2024 results, and on a February 2024 call Forvia said it had very limited restructuring left to do in North America, where most of the adaptation was already done, according to its call summary. Since then it has told Ohio it's closing two plants, Troy in 2024 and Franklin in 2026, in the Troy notice and the Franklin notice.
Can laid-off Forvia workers move to another Forvia plant?
In 2016 Faurecia said it would try to relocate some workers from its closing Michigan plants and offer job training and placement, Just Auto reported, and in 2023 the company encouraged Highland Park's workers to apply for open positions at its other Metro Detroit operations, according to Cluster Industrial. Both offers were made for those closings.
Sources for this page
- Our WARN filing tracker
- Faurecia Clean Mobility WARN letter to Ohio, November 6, 2026 (Franklin plant closure)
- Faurecia Exhaust Systems WARN letter to Ohio, September 4, 2024 (Troy plant closure)
- WYSO, Global automotive supplier to shut down Troy plant (September 12, 2024)
- Michigan LMI WARN notice archive, 2016 to 2024 tables (Wayback capture of May 25, 2025)
- Cluster Industrial, Forvia cierra planta en Michigan y traslada su producción a Nuevo León (July 31, 2023)
- FORVIA H1 2023 results release, July 27, 2023 (AMF regulated-information copy)
- FORVIA release on its February 21, 2024 conference call, February 22, 2024 (AMF regulated-information copy)
- FORVIA FY 2024 results release, February 28, 2025
- FORVIA 2025 annual results release, February 24, 2026
- Just Auto, Chrysler 200 end costs 348 Faurecia interiors jobs (October 14, 2016)
- Catfish 100.1 Tuscaloosa, Faurecia to Close Tuscaloosa Plant, 166 Employees to Lose Jobs (February 4, 2020)